ISVTEC Infrastructure

One-Off DevOps Missions

Zero-downtime migration, OS upgrade, load testing, CI/CD, capacity planning: one senior engineer, one scoped mission, a fixed price, done.

Not every problem needs a retainer. Some need a senior engineer for a focused mission: move the platform without anyone noticing, survive next month’s TV broadcast, finally upgrade that operating system. Then it is done.

Infrastructure-layer work: the operating system, the servers, the hosting, the network, the pipeline. For the application code, see Managed Web Application Maintenance.

Missions We Handle

  • Transparent server or hosting provider migration, zero downtime
  • Cloud migration: AWS, Scaleway, OVHcloud, GCP, Azure
  • Major operating system upgrades
  • Hardware refresh and server renewal
  • Load testing before marketing events or go-lives
  • Scaling architecture for traffic peaks, capacity planning
  • Post-mortems after incidents
  • CI/CD pipeline setup
  • Infrastructure audits; for security, see the cybersecurity audit

Proof: One Show, Two Sites

“Qui veut être mon associé”, season 4, episode 8. One featured site crashed on air. Another, load-tested and prepared before the show, held the traffic and grew from 1 to 5 million EUR in annual revenue after the broadcast.

A Migration Your Visitors Never See

Full backup, new system installed and configured, initial data copy, services validated on a temporary address, differential copy, switchover behind a proxy, DNS update, logs checked. Nobody notices.

How It Works

Scoped, priced, delivered: fixed fee or day rate, agreed before we start. You own everything we produce. No lock-in. Most audits complete in one week.